After a leisurely summer, we have kicked back into project mode..... The master bathroom has twin sinks, and each side has the same storage unit configuration of 3 drawers and 3 open shelves....Jeff used IKEA drawer panels that matched our drawers to build the box up at the top, he cut a hole in the panel for the low voltage lights and now we can really see the things that are on these shelves...
From March of 05-July of 06 we built a new house on an urban infill lot near downtown Sacramento. Jeff designed it, Mike was the general contractor. Our house is 3 stories high and 17' wide x 72' long. Among the goals were energy efficiency, cool design, & noise mitigation as we are right next to an 8 lane freeway. The house has solar electric, solar hot water & radiant heat. For the past 4 years we have been working on the landscaping...
Monday, November 24, 2008
Bathroom cabinets are finally done...
After a leisurely summer, we have kicked back into project mode..... The master bathroom has twin sinks, and each side has the same storage unit configuration of 3 drawers and 3 open shelves....Jeff used IKEA drawer panels that matched our drawers to build the box up at the top, he cut a hole in the panel for the low voltage lights and now we can really see the things that are on these shelves...
| Reactions: |
Subscribe to:
Post Comments (Atom)
1 comments:
Ooh this is fabulous! Cool bathroom cabinets and decoration ideas.
Post a Comment