We installed the vacumn unit for the whole house vacumn cleaner out in the garage in late May...All the tubing was run during construction, we were finally able to afford the actual unit...the first and second floor each have two outlets, the third floor only needed one as it is not as big..... We LOVE it...works like a charm...dragging the vacumn cleaner up three flights of stairs lost its charm long ago...now we just drag the hose from floor to floor..
From March of 2005-July of 2006 we built a new house on an urban infill lot near downtown Sacramento. Jeff designed it, Mike was the general contractor. Our house is 3 stories high and 17' wide x 72' long. Among the goals were energy efficiency, cool design, & noise mitigation as we are right next to a 10 lane freeway. The house has solar electric, solar hot water & radiant heat. For the past 9 years we have been working on the landscaping and enjoying our home.