Low Voltage Wire is DONE!

After 4 weekends of pulling wire to all edges of the house, it is finally done.

The wires coming out of the left orange box are the speakers and volume control wires.
The wires coming out of the right orange box are the security system wires.

The Wires in the steel box are the telecommunications (Coaxial and Cat5E) wires.)

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...