Leaks, Blame, Drama.....



During the big rain storms over the holidays we discovered some leaks...One was at the big window on the East end of the house...the other was in the French doors in the master bedroom.......The stucco contractor wanted to make sure it was not his fault, so he has removed the stucco around the areas where the leaking occured....It looks like a window flashing problem..The window/door supplier stopped by twice this week and has caulked the hell out of the two suspected leaking areas....hopefully it fixes the problem...

Regardless, the third and final stucco color coat is NOT going on this week as there are now two huge holes to repair....

The stucco people and the window people are already arguing over who has to pay for the stucco repairs....

The joys of general contracting.....

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...