The final punch list

At long last the end is finally almost here.....Jeff and I are going to use some vacation days next week to knock out the final punch list so that we can move in the weekend of June 10 & 11th. Have some time on your hands? Stop by, we'll give you a job.

concrete floors downstairs - strip bad areas, re-stain, seal
cork floors on 2 upper floors - clean and seal
stairs - install cork on treads/risers & attach red oak nosing pieces
kitchen - install cabinet doors/handles & all the shelves and drawer inserts.
laundry room - install washer and dryer
garage - finish painting section where the doors were stored
master bath - install cabinets on both sides of the sinks
offices - install filing cabinets/shelves
kitchen - hook up refrigerator/wine cooler / dishwasher

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...