Our HVAC guy came by last week to test the `tightness' of the house.After shutting all the windows and doors, he installed this plastic piece over the door and started up the fan to pump air out of the house. We've got to get him some ceiling measurements so he can calculate the volume of air in the house. Based on the measurements that his device measured, we have very little air leakage and should be able to heat the house with minimal energy...

It's almost time to turn on the radiant heat, the concrete floor on the first floor is starting to feel chilly.

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...