Skip to main content

Door City


Jeff came up with the solution of using doors as the frame around which we would construct bathroom shelving. It meant LOTS of careful measuring and detailed cutting as messing up would mean a trip to the door store to buy a new one. Thanks to Al B. for his help with the cutting and fitting process...

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

Out of the gutter and into the cold..

Although the stucco guys completed their job a couple of weeks ago, some minor cracks developed in 3 areas and they have come back to patch them up..... Having the scaffold up for the stucco guys allowed our gutter guy to hang the final piece.... On Wednesday of this week the guys from Airsmiths installed the air conditioning condenser...If you're wondering if that is the American Standard Allegiance 14 Super Efficiency Condenser, you would be right! It is made in Texas in the same factory that Trane air conditioners are made at. http://www.americanstandardair.com/Products.asp?Section=homeOwners&ProductID=7&CategoryID=16&SuperCategoryID=1

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...