Summer is over, back to work...

After 5 years of no vegetable gardening I am SO excited to have 2 raised beds for the 2010 season!!!

The fence along highway 50 is steel that is designed to rust, this photo was taken in October when the fence was installed and it is already starting to take on a nice reddish color...


This is the rear garden shed where the potting bench will be...


This is the front storage shed...It's basically a fancy-pants way to disguise our garbage cans.


We didn't do many garden projects over the summer months as we were both swamped with our jobs and with volunteer work....This fall we finally decided that if we were ever going to get finished with the yard we were going to have to have some help. Thanks to the guys at Deome Builders, we now have two garden sheds, our fences are all done, and we have interior garden `walls' that will help to give some sense of garden `rooms'....

Comments

Popular posts from this blog

Out of the gutter and into the cold..

Although the stucco guys completed their job a couple of weeks ago, some minor cracks developed in 3 areas and they have come back to patch them up..... Having the scaffold up for the stucco guys allowed our gutter guy to hang the final piece.... On Wednesday of this week the guys from Airsmiths installed the air conditioning condenser...If you're wondering if that is the American Standard Allegiance 14 Super Efficiency Condenser, you would be right! It is made in Texas in the same factory that Trane air conditioners are made at. http://www.americanstandardair.com/Products.asp?Section=homeOwners&ProductID=7&CategoryID=16&SuperCategoryID=1

Disaster averted....One step closer

Yesterday the City Utilities Dept. sent out the guy that is Mr. Sewer for all of East Sac....He had an old map of our part of town that showed the water and sewer lines running diagonally across our lot!!! After one quick look at the manhole in the front of the lot and the manhole in the alley, it was easy to see that the sewer line ran parallel and well within the 20 foot easement....excellent, but what about water? Today the Utilities Department sent out the guy that is Mr. Water for all of East Sac...he had one of those retro 1970's-esq Fu Man Chu mustaches, not that I noticed.... Anyway, he brought all sorts of fancy pipe detection equipment and in no time at all he found the water pipe....It was also well within the easement and does not run under house site....phew... Pat at the City Utilities Department just called, she had that perky and cheerful voice that most people get when they can tell you that a problem has been averted, she used that voice when she told me ...

We have officially started!

After almost 3 years of planning and designing on paper, today we took the first steps on the site of our new house. We cut down and carted away our fruit cocktail tree (a grafted fruit tree that had branches of nectarine, peach, plum, and apricot), 2 grape vines, a grafted Asian pear tree that had 4 varieties of pear, a grapefruit tree, a lemon tree, and an orange tree. It was sad to see them go, but it was exciting to think of what is to come.