Skip to main content

Summer is over, back to work...

After 5 years of no vegetable gardening I am SO excited to have 2 raised beds for the 2010 season!!!

The fence along highway 50 is steel that is designed to rust, this photo was taken in October when the fence was installed and it is already starting to take on a nice reddish color...


This is the rear garden shed where the potting bench will be...


This is the front storage shed...It's basically a fancy-pants way to disguise our garbage cans.


We didn't do many garden projects over the summer months as we were both swamped with our jobs and with volunteer work....This fall we finally decided that if we were ever going to get finished with the yard we were going to have to have some help. Thanks to the guys at Deome Builders, we now have two garden sheds, our fences are all done, and we have interior garden `walls' that will help to give some sense of garden `rooms'....

Comments

Popular posts from this blog

Fridge is in

The kitchen cabinet bases are all installed, the only appliance we have placed is the fridge. The others will go in over the next week or so....you can see the Eucalyptus veneer on our cabinets....yes, they are from IKEA.....it has been a lot of work for Jeff to put them together, but they were significantly less expensive than the other choices we looked at.

3rd Floor bathroom progress

One of the cool things about the house is that when taking a shower in the 3rd floor bathroom, ones head will be in the skylight dome....Do they issue tickets for flashing a helicopter? You can also see that the HVAC (heating, ventilation and air conditioning) guys started last week. They started to pull duct work up to the air exchanger and fan on the 3rd floor.... All 4 of the toilets in the house are wall mounted Geberit low flow toilets with dual flush mode. You can see the `carrier' for the toilet in the middle of this pic. The tank for the toilet is hidden in the wall cavity. We bought almost all of our plumbing fixtures online. The sinks and toilets were purchased from Ira Wood & Sons in Kentucky. They have an excellent website for comparing products: http://store.yahoo.com/irawoodinc/tewamotosy.html

Disaster averted....One step closer

Yesterday the City Utilities Dept. sent out the guy that is Mr. Sewer for all of East Sac....He had an old map of our part of town that showed the water and sewer lines running diagonally across our lot!!! After one quick look at the manhole in the front of the lot and the manhole in the alley, it was easy to see that the sewer line ran parallel and well within the 20 foot easement....excellent, but what about water? Today the Utilities Department sent out the guy that is Mr. Water for all of East Sac...he had one of those retro 1970's-esq Fu Man Chu mustaches, not that I noticed.... Anyway, he brought all sorts of fancy pipe detection equipment and in no time at all he found the water pipe....It was also well within the easement and does not run under house site....phew... Pat at the City Utilities Department just called, she had that perky and cheerful voice that most people get when they can tell you that a problem has been averted, she used that voice when she told me ...