SouthSide Sheathing.....

This week the guys installed the roof above the second floor cantilivered overhang shown on the right in the pic below. They also installed the facsia on the roofline, the metal shear straps between the second and third floors and started to install the roof sheathing.

Framing was supposed to take 6 weeks....We are now at the end of week 9......

Draw your own conclusions......


Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...