SouthSide Sheathing.....

This week the guys installed the roof above the second floor cantilivered overhang shown on the right in the pic below. They also installed the facsia on the roofline, the metal shear straps between the second and third floors and started to install the roof sheathing.

Framing was supposed to take 6 weeks....We are now at the end of week 9......

Draw your own conclusions......


Comments

Popular posts from this blog

Driveway Drama and Design

City of Sacramento Building Code requires us to lay a concrete driveway even though our garage entrance is onto an unpaved and seldom used alley..(And in spite of the fact that we won't be parking our cars in our garage or on this driveway!) Our neighbor across the alley built his house a year ago and they didn't make him put in a concrete drive......We are compromising by putting in concrete pavers with gaps that we can plant into....Defining the space will be a twelve inch band of concrete.......The primary viewing of this garden will be from the picture windows on the second floor, the view from up there is shown on this picture.

Out of the gutter and into the cold..

Although the stucco guys completed their job a couple of weeks ago, some minor cracks developed in 3 areas and they have come back to patch them up..... Having the scaffold up for the stucco guys allowed our gutter guy to hang the final piece.... On Wednesday of this week the guys from Airsmiths installed the air conditioning condenser...If you're wondering if that is the American Standard Allegiance 14 Super Efficiency Condenser, you would be right! It is made in Texas in the same factory that Trane air conditioners are made at. http://www.americanstandardair.com/Products.asp?Section=homeOwners&ProductID=7&CategoryID=16&SuperCategoryID=1