This week the guys installed the roof above the second floor cantilivered overhang shown on the right in the pic below. They also installed the facsia on the roofline, the metal shear straps between the second and third floors and started to install the roof sheathing.
Framing was supposed to take 6 weeks....We are now at the end of week 9......
Draw your own conclusions......
Framing was supposed to take 6 weeks....We are now at the end of week 9......
Draw your own conclusions......