Weekend Warriors

Saturday was a big day here. Carlos and his quiet mystery man helper showed up and put the framing in for the end walls of the third floor.... Cool!!

The third floor will have three windows at each end, the one pictured below faces the alley and has brilliant views of 8 lanes of freeway. On a clear day, the Sierra Nevada Mountains and the Lake Tahoe Basin are visible. The north side of the 3rd floor will have two big windows that look into the redwoods and the freeway beyond. The south side of the 3rd floor will have no windows but it will have two large sky-lights, one over the shower in the bathroom and one over the stairway...

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...