Electricity is done!


Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday)

The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do.....

Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

Comments

Popular posts from this blog

Out of the gutter and into the cold..

Although the stucco guys completed their job a couple of weeks ago, some minor cracks developed in 3 areas and they have come back to patch them up..... Having the scaffold up for the stucco guys allowed our gutter guy to hang the final piece.... On Wednesday of this week the guys from Airsmiths installed the air conditioning condenser...If you're wondering if that is the American Standard Allegiance 14 Super Efficiency Condenser, you would be right! It is made in Texas in the same factory that Trane air conditioners are made at. http://www.americanstandardair.com/Products.asp?Section=homeOwners&ProductID=7&CategoryID=16&SuperCategoryID=1

Disaster averted....One step closer

Yesterday the City Utilities Dept. sent out the guy that is Mr. Sewer for all of East Sac....He had an old map of our part of town that showed the water and sewer lines running diagonally across our lot!!! After one quick look at the manhole in the front of the lot and the manhole in the alley, it was easy to see that the sewer line ran parallel and well within the 20 foot easement....excellent, but what about water? Today the Utilities Department sent out the guy that is Mr. Water for all of East Sac...he had one of those retro 1970's-esq Fu Man Chu mustaches, not that I noticed.... Anyway, he brought all sorts of fancy pipe detection equipment and in no time at all he found the water pipe....It was also well within the easement and does not run under house site....phew... Pat at the City Utilities Department just called, she had that perky and cheerful voice that most people get when they can tell you that a problem has been averted, she used that voice when she told me ...

We have officially started!

After almost 3 years of planning and designing on paper, today we took the first steps on the site of our new house. We cut down and carted away our fruit cocktail tree (a grafted fruit tree that had branches of nectarine, peach, plum, and apricot), 2 grape vines, a grafted Asian pear tree that had 4 varieties of pear, a grapefruit tree, a lemon tree, and an orange tree. It was sad to see them go, but it was exciting to think of what is to come.