Skip to main content

Pivot Hinge Installation











We have 32 interior doors...Two of them have regular butt hinges....the rest of them use pivot hinges.......The fabrication of these doors has been quite a process....The frames were custom made, on site, one by one.....The doors are being cut to size and milled on site as well, the work is going slowly, but we know they will be worth the wait.....Shown here is an installed lower hinge along with a plumb weight hanging down from the upper pivot..The installation really needs to be done perfectly the first time...

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...