Skip to main content

Future Guest Spa

It's not real glamorous right now, but give us about 3 months, a couple of candles, and a fluffy towel or two and this is going to be the guest bathroom. The frame for the jacuzzi tub was installed this week...


Comments

Anonymous said…
I prefer a flat screen tv over the tub please along with a beer holder.....looks wonderful! Love cousin LeeLee
Anonymous said…
Hey guys, nice to see the progress. Corrado and I would like to book a night in about 3 months, when you're read to take reservations.

Jeffro

Popular posts from this blog

Out of the gutter and into the cold..

Although the stucco guys completed their job a couple of weeks ago, some minor cracks developed in 3 areas and they have come back to patch them up..... Having the scaffold up for the stucco guys allowed our gutter guy to hang the final piece.... On Wednesday of this week the guys from Airsmiths installed the air conditioning condenser...If you're wondering if that is the American Standard Allegiance 14 Super Efficiency Condenser, you would be right! It is made in Texas in the same factory that Trane air conditioners are made at. http://www.americanstandardair.com/Products.asp?Section=homeOwners&ProductID=7&CategoryID=16&SuperCategoryID=1

Controlling the weather

We installed a Weathermatic irrigation system controller.  It is connected to an on-site weather station that monitors temperature, rainfall, windspeed, and humidity. As the seasons change, it automatically adjusts the station timing, very handy! UPDATE:  We had nothing but trouble with this controller and in 2016 we replaced it with a dramatically better one from Rachio. See it here: https://www.rachio.com/ Better yet, the City of Sacramento has a rebate program to replace old controllers with `smart' controllers like the Rachio, check it out here: https://www.cityofsacramento.org/Utilities/Conservation/Rebates/River-Friendly-Landscape-Rebate  

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....