Final-ly

The electrician was here most of Saturday, the plumber was here most of the morning today, the HVAC guys are still here.....The punch list from Friday was punched out.....

The inspector came by....

The final signature is on the dotted line...

We have officially passed the last major hurdle....

We have some trim work to finish this week, some countertop needs to be installed in the laundry area, there are 3 more doors to hang...when that is all done, we'll call the painters and hopefully by the end of next week the place will be pretty much DONE....

Comments

Popular posts from this blog

Out of the gutter and into the cold..

Although the stucco guys completed their job a couple of weeks ago, some minor cracks developed in 3 areas and they have come back to patch them up..... Having the scaffold up for the stucco guys allowed our gutter guy to hang the final piece.... On Wednesday of this week the guys from Airsmiths installed the air conditioning condenser...If you're wondering if that is the American Standard Allegiance 14 Super Efficiency Condenser, you would be right! It is made in Texas in the same factory that Trane air conditioners are made at. http://www.americanstandardair.com/Products.asp?Section=homeOwners&ProductID=7&CategoryID=16&SuperCategoryID=1

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...