Skip to main content

Plumbing is almost done....

Here are the sinks in the master bathroom, they are
Duravit sinks and we really love them....GOSH those
faucets stick out a long ways.....they are a bit longer
than we thought they would be...oh well...





Here is a detail from the half bath on the first floor.



We have four showers in the house and all
of them were missing the screws that hold on
the escutcheon.Thanks to their website, we are
back in business. http://www.danze.com/

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...