The pic below shows Jeff's brother Scott finishing up the framing of a door, every door opening was custom made as we have pivot hinge doors that will not be hinged on the side of the frame but on the top and bottom.
In the background is Adam on a ladder doing soldering of the copper pipe that will go from the solar hot water collector down to the garage where the hot water tank will be located.