Skip to main content

Doors and Water Pipes

The pic below shows Jeff's brother Scott finishing up the framing of a door, every door opening was custom made as we have pivot hinge doors that will not be hinged on the side of the frame but on the top and bottom.

In the background is Adam on a ladder doing soldering of the copper pipe that will go from the solar hot water collector down to the garage where the hot water tank will be located.

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...