We're ready for the rain...

After countless delays we finally have shingles on the house...Unfortunately, despite designing the system, the roofing company didn't deliver enough ridge vent to finish the installation of the custom vent flashing system for the interface between the living room roof and the 3rd floor exterior wall...And since Home Depot does not stock this item, they could not finish the flashing and top row of shingles. ..That also means that the stucco guys can't put foam on up there till the roofers come back....

Lesson of the week: Details matter....

Comments

Popular posts from this blog

Electricity is done!

Our electrical service is done! (well, except for the all important punch list that will be knocked out on Monday) The Integrity Electic guys spent several days here this week. They said we have one of the most intense switching systems they have ever seen in a residential project.......I must confess that I'm still not sure what all 12 of the switches behind the front door actually do..... Pictured is Joe from Integrity Electric putting the finishing touches on our kitchen island. The counter top guys were here on Wed to measure the counters, they were fabricated today and will be installed next Wednesday....

It's finally done...

   We're excited to report that our house is finally, really, officially DONE!  The shower hardware in the third-floor bathroom was installed this past weekend.   Yes, we moved in back in June of 2006....Don't judge...