Why do they call them punch lists?

The end of the tunnel is within sight....We hope to start sheet rocking on Tuesday of this week...It was a very productive and busy weekend...Doing what?? Well, to give you a taste, this was Sunday's punch list....

Sunday - Nov 20th Punch List
Jeff

1. Bathroom Wiring Adjustments
2. Vacumn Cleaner Wiring Loop
3. Thermostat Wiring
4. Blocking in all 4 Bathrooms for towel bars
5. Attach the control panel frame to the wall.
6. Blocking in Living Room for Drapes
7. Blocking in Bathrooms for shower curtains
8. Blocking in Kitchen for hood
9. Install Dryer Vent
10. Install low voltage wire in Kitchen and Laundry
11. Pipe Insulation on 3rd Floor
12. Run 2 conductor wire from hot water solar panel to garage.

Mike
1. Run speaker wires to Mike's Office
2. Run volume control to Mike's Office
3. Confirm all smoke detector and motion detector wires are in.
4. Install 3 sets of speaker Rings
5. install Sirius Sat. wire run to attic
6. Install smurf tube to attic for Satellite wire runs
7. Exterior Speaker Placement,penetrations & Wire runs
8. Exterior Volume control run to laundry area
9. Drill door frames for alarm contacts
10. Run extra Cat5 from headroom to media room
11. Insulate garage door.
12. Pull Cat5 wire to garage
13. Pull speaker wire to kitchen
14. Pull 2 volume controls to Kitchen
15. Unbury pex piping in insulation next to living room bench
16. Pull string under bench to expansion box.
17. Finish putting foam around all windows and doors

Comments

Popular posts from this blog

Fridge is in

The kitchen cabinet bases are all installed, the only appliance we have placed is the fridge. The others will go in over the next week or so....you can see the Eucalyptus veneer on our cabinets....yes, they are from IKEA.....it has been a lot of work for Jeff to put them together, but they were significantly less expensive than the other choices we looked at.

3rd Floor bathroom progress

One of the cool things about the house is that when taking a shower in the 3rd floor bathroom, ones head will be in the skylight dome....Do they issue tickets for flashing a helicopter? You can also see that the HVAC (heating, ventilation and air conditioning) guys started last week. They started to pull duct work up to the air exchanger and fan on the 3rd floor.... All 4 of the toilets in the house are wall mounted Geberit low flow toilets with dual flush mode. You can see the `carrier' for the toilet in the middle of this pic. The tank for the toilet is hidden in the wall cavity. We bought almost all of our plumbing fixtures online. The sinks and toilets were purchased from Ira Wood & Sons in Kentucky. They have an excellent website for comparing products: http://store.yahoo.com/irawoodinc/tewamotosy.html

Out of the gutter and into the cold..

Although the stucco guys completed their job a couple of weeks ago, some minor cracks developed in 3 areas and they have come back to patch them up..... Having the scaffold up for the stucco guys allowed our gutter guy to hang the final piece.... On Wednesday of this week the guys from Airsmiths installed the air conditioning condenser...If you're wondering if that is the American Standard Allegiance 14 Super Efficiency Condenser, you would be right! It is made in Texas in the same factory that Trane air conditioners are made at. http://www.americanstandardair.com/Products.asp?Section=homeOwners&ProductID=7&CategoryID=16&SuperCategoryID=1